Aim of this project was to start Labnah factory and utilities, to do training for Operators, Maintenance and Management. Scope of installed Utilities: Boiler, Air compressor, CIP Line, Chiller. Scope of installed Processing equipment: Milk reconstitution tanks 2 x 6000 L, Pasteurizer 10 0000 l/h, Homogenizer 10 000 l/h, Process tanks for Labneh 6 pcs with two PHE and lobe pump for cooling from 45°C to 15°C at 5 000 l/h.
Successfully completed before the New Year, as planned with the customer.
Contact us today, and we’ll be happy to help you to the next step.